Jake Greaves
Public Repositories (4)
-
Last updated: 15 Feb 2019 35 1
-
Last updated: 13 Dec 2018 4 2
-
Last updated: 29 Nov 2018 1 2
-
Mbed 2 deprecated
Laser_Maze_Comparator
Working laser maze comparator. Solar cells need to be connected with ground and the +ve line connected to A0 - A4. These correspond to the output on D6-D2 respectively. Reseting …
Last updated: 29 Nov 2018 3 3